Biogas upgrading plant with anaerobic digester domes and upgrading skid
← Back to SyngasWorx Our Technologies

Biogas Upgrading

Raw biogas becomes pipeline-grade biomethane — compressed as bio-CNG or liquefied as bio-LNG for transport and industry.

Bio-CNG Bio-LNG
The Challenge

Biogas Deserves Better Than Flaring

Palm oil mills, farms and food factories produce enormous biogas potential — yet most of it is flared or vented. Upgrading turns that wasted methane into a premium transport fuel.

The Process

Biogas → Biomethane → Bio-CNG / Bio-LNG

From digester to dispenser — a complete upgrading chain matched to your gas source.

1
Anaerobic Digestion

Organic waste — POME, manure, food waste — is digested into raw biogas, typically 55–65% methane.

2
Upgrading

H₂S, CO₂ and moisture are removed, lifting methane content to pipeline grade (typically >96%).

3
Compression / Liquefaction

Biomethane is compressed to bio-CNG for local fleets or liquefied to bio-LNG for longer hauls and shipping.

Key Benefits

Why Biogas Upgrading

  • Premium fuel value — biomethane earns far more as transport fuel than as flared gas or raw electricity
  • Methane captured — stops a potent greenhouse gas from reaching the atmosphere
  • Drop-in for gas fleets — bio-CNG runs in existing NGV trucks and buses
  • Grid injection ready — pipeline-grade biomethane can feed the gas network
  • Waste problem solved — POME ponds and manure lagoons become assets
Request a Feasibility Review
Feedstocks

What It Processes

Any steady organic waste stream with biogas potential — assessed for volume, consistency and methane yield.

  • POME — palm oil mill effluent, the region's largest biogas resource
  • Livestock manure — from cattle, poultry and swine operations
  • Food & agro-industrial waste — from factories, markets and processing plants
Industries Served

Where Biogas Upgrading Fits

Related Technologies

Explore the Family

Discuss Your Biogas Project

Tell us about your organic waste stream — we will estimate the biomethane potential and the right upgrading route.

Start Your Project Assessment